Hillsborough County, FL
As part of a broader initiative to enhance drainage systems in the region, Aptus successfully completed a bridge drainage installation designed to mitigate deck flooding and improve roadway safety during rainstorms. This project required careful planning, precise execution, and expert navigation of unique site constraints—all while staying on time and under budget.
- 4,400 linear feet of 12″ SCH80 PVC drainage pipe for enhanced water flow management
- 3,000 linear feet of 8” SCH80 PVC drainage pipe, ensuring efficient runoff control
- 700 12″ clevis hangers providing secure and long-lasting support
- 470 8″ clevis hangers designed for maximum durability
To ensure seamless and precise installation, our team utilized:
✅ HydraPlatform for optimal under-bridge access
✅ Aspen A-62 for safe and efficient work positioning
✅ Snooper 140 for reaching critical installation points