Columbia, SC

Aptus completed an infrastructure upgrade enhancing the drainage and utility capabilities of this bridge to provide long-term reliability and performance. This project ensures efficient water management and secure utility support, reinforcing the bridge’s durability for years to come.

  • 4” FRP deck drain conduit installed on both abutments for improved drainage
  • 2,880 linear feet of 6″ XHW fiberglass conduit, providing a durable and corrosion-resistant solution for utility routing
  • 30 FRP grid-style hangers (3×4) for secure and stable conduit support

To safely and effectively complete this installation, the Aptus team utilized Safe Span in conjunction with boom lifts, ensuring safe access and precision throughout the project. Our strategic approach minimized disruptions while maximizing efficiency.