Arizona

Aptus successfully completed a multi-location bridge-attached utility project along I-19, spanning 15 bridges from Nogales to Tucson. This project plays a vital role in strengthening Arizona’s infrastructure, ensuring a durable and reliable utility system that supports both local communities and the region’s growing transportation needs.

  • 2,930 linear feet of 3″ RGS pipe, providing a robust and corrosion-resistant conduit system across multiple bridge structures

Working across multiple bridge locations presented unique logistical and operational challenges. Our team utilized the Snooper Bridge Truck, a specialized piece of equipment that enabled:

  • Efficient and precise installations, even in hard-to-reach areas
  • Enhanced safety for crews working at height, ensuring a controlled and stable platform
  • Optimized project timelines, allowing us to meet deadlines without sacrificing quality

Click any image to expand and view gallery